How to Choose the Right Septic System for New Construction
Building a new home in the Houston area? Here's what you need to know about selecting, designing, and permitting the right septic system for your property.
Aqua Star Team
Aqua Star Well and Septic, LLC

Building a new home or commercial property in the greater Houston area means making important decisions about your wastewater system. If your property isn't connected to a municipal sewer, you'll need a septic system — and choosing the right one from the start saves money, prevents problems, and ensures compliance with local regulations.
Start with a Site Evaluation
Before anything else, a licensed septic professional must evaluate your property. This evaluation determines:
- Soil type — Clay, sandy, or loamy soil affects system type and drain field design
- Percolation rate — How quickly water drains through your soil
- Water table level — High water tables may require aerobic systems
- Lot size and layout — Available space for tank and drain field
- Topography — Slope and drainage patterns
- Existing features — Trees, structures, wells, and property lines
This evaluation is required for permitting and determines which system types are even possible for your property.
System Types for New Construction
Conventional Gravity Systems
The traditional, lowest-cost option. Best for properties with well-draining soil and adequate space. Wastewater flows by gravity from the tank to the drain field. Costs $5,000–$10,000.
Aerobic Treatment Units (ATUs)
Required in many Houston-area subdivisions with clay soil or high water tables. Uses oxygen to treat wastewater more completely, then pumps effluent to a spray field. Costs $10,000–$20,000+.
Low-Pressure Dosing Systems
A middle-ground option that uses a pump to distribute effluent evenly across the drain field. Suitable for properties with marginal soil or limited space.
Mound Systems
Used when soil conditions are very poor or the water table is very high. The drain field is built above ground level in a constructed sand mound. More expensive but necessary in challenging conditions.
Factors in Your Decision
Soil Type (The Most Important Factor)
Houston-area soils range from sandy loam to heavy clay. Clay soils don't drain well and often require aerobic systems or alternative drain field designs. A site evaluation and soil analysis will determine what's feasible.
Lot Size
Conventional systems need more space for the drain field. If your lot is small, an aerobic system with a spray field may be the better — or only — option.
Number of Bedrooms
System size is based on the number of bedrooms in your home, not the number of bathrooms. More bedrooms means a larger tank and drain field.
Water Table
In low-lying areas of Harris and Montgomery counties, the water table can be high. This limits system options and may require aerobic or mound systems.
Local Regulations
Each county has its own environmental health department with specific requirements. In many subdivisions, aerobic systems are mandated regardless of soil type. We handle all county permitting and ensure full TCEQ compliance.
The Permitting Process
Installing a septic system without a permit is illegal and can result in fines and mandatory removal. The permitting process includes:
- Site evaluation and soil analysis — Performed by a licensed professional
- System design — Based on the site evaluation
- Permit application — Submitted to the county environmental health department
- Installation — By a licensed installer (we are TCEQ licensed)
- Final inspection — County inspector verifies the installation meets code
We handle all of this for you — from evaluation to final inspection.
When to Start the Process
Start the septic system planning process as early as possible in your construction timeline. Soil evaluations, design, and permitting can take 2–4 weeks. The installation itself takes 2–5 days once permits are approved. Don't wait until your home is nearly complete to start thinking about septic.
Financing Available
A new septic system is a significant investment. We offer financing with low-interest plans and 0% APR offers to help make it manageable. Ask us about financing options during your consultation.
Schedule Your Site Evaluation
At Aqua Star Well and Septic, we've been designing and installing septic systems for new construction throughout the greater Houston area since 1976. Our TCEQ-licensed team handles everything from site evaluation to final inspection. Call 936-931-2443 to schedule your free site evaluation.
Need Well or Septic Service?
Our licensed, insured team has served the greater Houston area since 1976. We're available seven days a week.
Call (936) 931-2443